End of Trip Facility Refurbishment
Just before Christmas 2018 we were awarded the tender for the refurbishment of the toilets and bike storage area for 256 Adelaide Tce, which we commenced on 18th January. The … Continue reading
Perth Retina
In early February 2017 we were asked to carry out the fit-out of the ophthalmology clinic at 160 Cambridge St for Perth Retina. The client needed to have the clinic … Continue reading
Peritus Fit-out
This was a small project in St Georges Terrace with three parts: separate an existing training room from the kitchenette to produce a board room, alter an office into a … Continue reading
Australian Hearing Rockingham
Our first major project for Australian Hearing was the construction of their Rockingham clinic. Some minor demolition was required to take the 130m2 shop back to an empty shell to … Continue reading
Decjuba Lakeside Joondalup
In November 2016 we carried out the fit-out of Decjuba’s new Joondalup store. This was a very quick fit-out that started on Thursday 3rd and was opened for trading on … Continue reading
Havelock St Retaining Wall
We demolished the existing 35m long 1.7m high reinforced brick retaining wall at 29 Havelock St West Perth, having been awarded a design and construct contract including approvals. Planning Commission … Continue reading
Riverpark Interpretation Nodes
Carleton Constructions were the successful tenderer for the construction of 3 Riverpark Interpretation nodes for the Department of Parks and Wildlife, at Point Walter, Bicton Baths and below Heathcote, on … Continue reading
MRWA MEB Transportable replacement $50K
This project was for the demolition, removal and replacement of the termite damaged archive office at Main Roads’ Materials Engineering Branch in Welshpool. The interior was reduced to the state in … Continue reading
MRWA Traffic Operation Centre Refurbishment $250k
One of the most interesting jobs we have done was the refurbishment of the Operations Room at Main Roads Traffic Operations Centre in East Perth. The project was for the … Continue reading
Department for Child Protection Level 2 Fit-out 189 Royal St East Perth $440k
Our second project for the Department for Child Protection was the fit-out of part of their head office on Level 2 of 189 Royal St, East Perth, as we were … Continue reading